Atlas  Pixel  Group  Irradiation  in  2001
Date of irr.
Name of the chip/structure
On-line tests
Requested or prepared by:
Nb of chips
Dose/Fluence
Report /
Status
Notes
February
FED-2S
Yes
LBNL

(prepared by  J. Richardson)

3
4Mrad - 1 board
5Mrad - 1 board
50Mrad - 1 board
February
June
done at LBNL (55MeV protons,  2Mrad/h, 4Mrad/h, 16Mrad/h)
February
 TSMC 
test structure
Yes
LBNL
(prepared by
P. Denes)
?
up to 10 Mrad
February
done at LBNL
24/5 - 4/6
Interlock box components
Yes
Wuppertal
(prepared by     S. Kersten)
.
210 Gy 
(21 krad)
Yes

 

done at Saclay facility Pagure
Co60 1.2-1.3MeV
16/4 - 25/4
VDC-D2
Yes
Ohio, Siegen, Wuppertal
3
.
 Yes
Cern/PS
pixel cold box
16/4 - 25/4
Doric-D2
Yes
Ohio, Siegen, Wuppertal
5
 .
 Yes
Cern/PS
pixel cold box
16/4 - 25/4
Opto-board
Yes
Ohio
1 board
.
 Yes
Cern/PS
shuttle system
16/4 - 25/4
Opto-package
Yes
Taiwan, Wuppertal
1 package
.
done
Cern/PS 
shuttle system 
16/4 - 25/4
specimens for shear tests
No
Marseille
1 piece
.
done
Cern/PS
shuttle system
28/5 - 4/6
NTC resistors
No
Wuppertal
1 board
.
done
Cern/PS
shuttle system
28/5 - 4/6
Passive components
No
Oklahoma
slides
1,6* 1015 p/cm2
done
Cern/PS
pixel cold box
28/5 - 4/6
CIS sensors
No
Dortmund
4+2 pieces
5* 1014 p/cm2
1,6* 1015 p/cm2
done
Cern/PS
shuttle system
28/5 - 4/6
TESLA sensor
No 
Prague
 47 pieces
5* 1014 p/cm2
1,6* 1015 p/cm2
done
Cern/PS
shuttle system
2/7 - 18/7
sensors
(adhesive tests)
No
Dortmund, Bonn
5 pieces
1,6* 1015 p/cm2
done
Cern/PS
shuttle system
2/7 - 18/7
CIS sensors 
(bumped)
No
Dortmund
2 pieces
5* 1014 p/cm2
1,6* 1015 p/cm2
done
Cern/PS
shuttle system
2/7 - 18/7
sensors
(mix C3F8+N2)
No
Dortmund
4 pieces
5* 1014 p/cm2
1,6* 1015 p/cm2
done
Cern/PS
shuttle system
2/7 - 18/7
sensors
(bias up to 600V)
Yes
(current)
Dortmund
2 pieces
5* 1014 p/cm2
1,6* 1015 p/cm2
done
Cern/PS
shuttle system
3/9 - 14/9
VDC-I
Yes
Ohio, Wuppertal
8 chips
50Mrad
Yes
Clemens
Cern/PS
pixel cold box
  3/9 - 14/9
   Doric-I, optoboard
    Yes Ohio, Wuppertal    1 board        40Mrad    Yes
    CERN/PS shuttle system
  3/9 - 14/9
FE-D2S
    Yes
 Marseille, Milano
  6+2 boards
  10,20,40,50 Mrad
Yes
Attilio
CERN/PS
shuttle, cold box

Last modified: 12th December 2001

by: Petr Sicho